Large-Capacity Offshore Waste Sump Tank for North Sea Platform
The project followed a structured design lifecycle spanning approximately seven months, beginning with early conceptual design, and evolving into a fully detailed final design prior to fabrication.
Suretank supplies OSM Modular electrical buildings to Biotechnology company
The project brief was to design from concept stage, in conjunction with our client, two modular electrical buildings and a fire rated support structure to elevate the larger building 3m above ground level to facilitate cable management systems..
Suretank provides complete project life-cycle services to a Norwegian energy company
The project brief was to design and manufacture a quantity of 27 certified DNV 2.7-1 Tool Baskets, which ranged in length from the shortest being 2.5m long up to the longest being 20m long.